12 May 2026, Tue

Tudun Wada Youth Forum Praises Jolex Construction Company, Governor Mutfwang for Quality Road Work

Img 20260205 183408

By Peter Akpah.Img 20260205 183408

The Tudun Wada Youth Forum has commended Jolex Construction Company for delivering good quality work on the ongoing road construction project in Tudun Wada, Sabon Gari, Mado, and Kabong. The group also expressed appreciation to Governor Caleb Manasseh Mutfwang for fulfilling his campaign promises on the project.Img 20260205 183353

Speaking with journalists during an on-the-spot assessment of the project, the youth leader, Goshit Maxwell Daniel, said the forum had been monitoring the work and was impressed with the quality of work being done by Jolex Construction Company. He noted that the contractor had provided jobs for the youth and women in the community and had also fulfilled its social corporate responsibility.

Daniel dismissed claims by some individuals that the contractor was doing substandard work, saying they were false and unfounded. He said the forum, which represents 38 units, had been working closely with the ministry of urban development to ensure the project met the required standards.

The youth leader appealed to Governor Mutfwang to visit the site and see the progress being made, and to ensure the project is completed before the rainy season. He noted that the road network connected virtually all communities in Jos and urged the governor to expedite the completion of the project.Img 20260205 183428

The deputy chairman of the Tudun Wada Youth Forum, Hassan Bumba Yakuba, also expressed support for Governor Mutfwang and Jolex Construction Company, saying the company had listened to the needs of the community and provided opportunities for the youth.

Yakuba urged those criticizing the contractor to stop, saying they were doing a good job and deserved encouragement. He noted that the community’s major problems were water, healthcare, schools, and skills acquisition centers, and appealed to the governor to address these issues.Img 20260205 183435

The Tudun Wada Youth Forum is calling on Governor Mutfwang to complete the road project as soon as possible, saying it would benefit the community and the entire Jos North area.

SN24.com

By SN24.com

Peter Akpah is an investigative journalist/Blogger a public affairs commentator, social media influencer, content creator and a chess player., studied journalism at MANCAT, Digital journalism with Router, attend many capacity building training on journalism and blogging.

One thought on “Tudun Wada Youth Forum Praises Jolex Construction Company, Governor Mutfwang for Quality Road Work”
  1. Ahhh leader. Toh the question is they said water, what will you said about water 🌊💦.?
    Leader pls response on water where you take the interview I think that’s where the water pipe stop,. Which we all can see it well that’s the water pipe was well removed by the contractor all at the cost of the construction, sir all those pipes should be replaced by now because the excavation, the drainage, sandfilling, and lateral has gone far and also yet to back fill the drainage which where the water 🌊💦 pipes should be replaced and there is no any effort on doing that no pipe no water 🌊💦..
    For fact now at the level of the job that we can see all that is left is spraying of (Mc1) and spray dust
    Next sweep it out and
    And spray Mc2 and sprayed chippings before (Ashfat)

    Sir if you as our leader will said who ever said so or talked about that is been paid for, sorry for me I don’t know who are the People, in fact I know well that I have provided money long ago In anguan mission in replacement of water pipe,..
    By now the water line should be laid behind the drainage and there is no anyone pipe laid and water pipe stop were you are taking your interview pls…

    From experience as ex staff with construction company pipes by now should be laid behind the drainage and anytime water board supply water we can get it in anguan mission, sir pls keep politics aside prove to us that you’re for the community, there is no water supply by water board in anguan mission.

    My leader question to you,
    Is the contract also with the water 🌊💦 attached to it?
    If yes pls follow up for replacement of the pipe properly.

    If the contract is not with the water 🌊💦 still follow up for replacement of the pipe because any Time as community or anyone comes over to ask us to contribute for water pipe we will hold you responsible for you said there is water 🌊💦
    We too appreciate the contractor for doing Well and also for following the work personally he is always on site to keep the job going he is a good leader by example keep on the good job sir, we pray at the end of the contract he will move to greater height in life.

Leave a Reply

Your email address will not be published. Required fields are marked *